Off-grid living in Florida: a property guide

Florida’s property question is not merely where water comes from. It is where wastewater can go when groundwater is high, where flood and coastal controls reach, and which office now holds the permit.

Onsite sewage

First find the permit desk.

Florida’s onsite program is moving from the Department of Health to the Department of Environmental Protection. DEP began direct permitting in 16 Northwest Florida counties on January 2, 2025 and later reported expansion into Marion County. Elsewhere, county health departments may remain the operational contact while DEP holds program authority. Check the current county assignment before filing.

DEP DIRECT

Transition counties

Use DEP’s current transition page and permitting platform, not an older statewide directory.

COUNTY HEALTH

Remaining counties

Confirm the county health department remains the application, inspection and records office.

SPECIAL SYSTEM

Operating permit

ATUs, performance-based systems and some commercial/industrial systems can carry continuing permit duties.

Check the current transition status

The vertical profile

Measure the wet season, not the sales-day weather.

Onsite feasibility turns on the actual site, usable area, seasonal high-water conditions, soil profile, setbacks, design flow and the approved treatment configuration. A dry surface visit does not answer the vertical separation question.

finished gradetreatment / drainfieldseasonal high wateraquifer

Private well

Construction rules and drinking safety are separate files.

Before drilling

Identify the county’s well-construction authority, setbacks, any contaminated-water “delineated area,” and whether the proposed use remains a single-family private well rather than a regulated limited-use or public system.

After completion

Florida places private-home water quality on the owner. DOH recommends bacteria and nitrate testing annually, lead about every three years, and additional location-specific testing.

Read the private-well testing guidance

Coastal parcel

A local building permit may not be the last shoreline approval.

Florida’s Coastal Construction Control Line creates separate state permit jurisdiction for regulated construction and activities seaward of the line. The program applies special siting and design criteria where storm forces and dune impacts are greater. Locate the mapped line against the actual survey before treating a coastal parcel as buildable.

Open CCCL maps and permits

Statewide technical code

Wind. Flood. Energy. Trades.

The Florida Building Code supplies the statewide construction baseline, while local building departments administer permits and inspections. The Commission’s site identifies the currently effective edition and subsequent supplements; 2026-edition material is also in development. Confirm the code named on the date your permit vests.

Do not confuse code-compliant construction with zoning approval, legal RV occupancy, a wastewater permit, floodplain authorization or coastal approval.

Florida buyer’s water file

Seven confirmations before closing

  1. 01zoning and dwelling use
  2. 02flood zone and design elevation
  3. 03wetlands and drainage
  4. 04CCCL / shoreline jurisdiction
  5. 05septic office and site feasibility
  6. 06well authority and testing panel
  7. 07building, trades and occupancy
Open the complete property checklist

Evidence ledger

Official Florida sources

Reviewed September 26, 2026. Because septic administration is actively transitioning, verify the permit office immediately before applying.

  1. FL1
    Onsite Sewage Program

    Florida Department of Environmental Protection · State program, rules, permits and transition information

  2. FL2
    Program Update — Phase I Transition

    Florida Department of Environmental Protection · DEP’s direct county permitting rollout since 2025

  3. FL3
    Private Well Water Testing

    Florida Department of Health · Owner responsibility, annual testing and sale guidance

  4. FL4
    Drinking Water Programs

    Florida Department of Health · Well construction, delineated areas and limited-use systems

  5. FL5
    Florida Building Code

    Florida Building Commission · Current code edition, supplements and 2026 update material

  6. FL6
    Coastal Construction Control Line Program

    Florida Department of Environmental Protection · State coastal permit jurisdiction, maps and applications

  7. FL7
    CCCL Rules and Statutes

    Florida Department of Environmental Protection · Permits seaward of control lines and the 50-foot setback